====== 11 Importing an assembly ======= ===== 11.1 Procedure -Importing a module ===== 1. on the File tab, select → {{:uc_import_assembly_en_001.png?nolink|}} **Import assembly into Teamcenter**. 2. Select **FFG Engineering Item** from the **Default Settings** group in the **Item Type** list. {{ :uc_import_assembly_en_002.png?direct&400 |}} 3. In the **Components** group, select the following: * Include Component Parts * Include dependent parts {{ :uc_import_assembly_en_003.png?direct&400 |}} **Tip:** \\ \\ If you also import component parts and dependent parts, you must select the **Include component parts** and **Include dependent parts** check boxes before you select the assemblies to import. 4. Click Find **Components** to display the dialog box **Load Options for Assemblies**. 5. In the **Load** list, select **From Folder**. 6. in the **Parts to import** group, click **Import from folder** {{:uc_import_assembly_en_004.png?nolink|}}. 7. Navigate to the appropriate directory in which the assembly to be imported is located and select the top element (top assembly node) for this. {{ :uc_import_assembly_en_005.png?direct&400 |}} 8. Under **Default Parameters**, in the **Default Destination Folder** box, type the path or navigate to the folder in Teamcenter where the imported items will be placed. You can manually type a folder that is outside your **personal tray** in the field, but you must have write permissions to the folder. {{ :uc_import_assembly_en_006.png?direct&400 |}} 9. Under Default Parameters, click Projects {{:uc_import_assembly_en_007.png?nolink|}}. 10. In the **Assign to Project** dialog box, select a project, and then click **OK**. The list contains the projects that are available in Teamcenter and of which you are a member. You can select one or more projects. 11. Click **Test Run** {{:uc_import_assembly_en_008.png?nolink|}} to perform a simulated import. When the simulated import process is complete, the Information window displays how the parts and assemblies were imported. In the **Information** window, check that all information, including **import action**, naming technique, directory path, etc., is correct. 12. Close the **Information** window. 13. Make a note of the item ID of the top assembly node. 14. In the Import **Assembly to Teamcenter** dialog box, click **OK** to start the import. 15. In the **Information** window, check whether the import took place as expected. 16. Display the imported items in **Teamcenter Navigator**. **Note:** \\ \\ The import of an assembly with drawings takes place via the same procedure → the import function recognizes whether a UGPart (drawing) exists for the UGMaster (model). This is automatically linked → the relationship type of the UGMaster is "master" and the drawing is "specification". \\ \\ **Caution:** \\ \\ Occasionally it happens that the old document number is stored as ID during the import → This can then be assigned manually according to the prescribed number range. A solution is being worked on. \\ How the import of assemblies is to be mapped processually with GoLive from Teamcenter still has to be defined. (Keyword: Duplicates).|@red: |